Model 100-SSC-SMClad Stainless Steel Changing StationInstallation Instructions (Surface Mount)• Failure to follow these warnings and the installation
1ADULT INSTALLATION REQUIRED.TOOLS REQUIRED:Level (A)Measuring tape (B)Power drill with 3/16”, 1/2” and 1/8” masonry bit (C)Power screwdriver with bul
2Recommended Blocking:Wood double stud blocking is necessary. Contact an architectand building official to make sure the blocking is adequate andcompl
3Using Toggle Anchors (Fig. f):1. Insert metal end of toggle anchor into 1/2” hole.2. Slide zip strip down snugly against wall.3. Snap off break-away
Comments to this Manuals